WARNING

Opening the ODS Vestibule Transfer Panel Vent may cause a loud hissing noise. Crew in the vicinity should don ear plugs._ ODS Vest 1.6 VENT OPEN GN2 Xfer Panel 1.7 Check GN2 Xfer Panel P ressure Gauge reading 0 psi. Doff ear plugs. 1.8 Wait 15 minutes or On MCC-H GO, proceed. 1.10 FLOW CLOSED 2. CONFIGURING PMA ODS FOR NOMINAL OPERATIONS QDs must be closed to disconnect lines. 2.1 GN2 Transfer Flex Hose Assy H GN2 Xfer Panel QD Inspect both QDs for debris. Install cap on GN2 Xfer Panel QD....

Seals and FOD Debris or Damage

In general there should be no debris on the seals or seal interface and no damage (dings into metal, etc.). Any FOD must be photo documented for ground assessment. In some cases Flight rules may allow to press with mating if soft or stringy type FOD goes across one of the three seal beads (accept loss of pressure redundancy for one flight, especially if an MPLM and not permanent module). Metallic or hard FOD can cause damage to the ACBM which will jeopardize not only this specific mating, but...

Vmcch

VERIFYING FLIGHT SPECIFIC PAD MCC-H If the following information is not recorded elsewhere, record it here. Version ID for CCS PPL 181 - CCS RM PPL For GNC RM with or without Checkpointing to be loaded to all C& C MDMs. If GNC RM with Checkpointing was inhibited for docking and is now enabled, uplink PPL to all C& C MDMs. Must be built as File Uplink. 3. VERIFYING CORRECT CONFIGURATION PCS MCG Dock and Undock Pre-Node 2 PMA 2 Dock Verify US Station Mode - Prox Ops Verify RS Station Mode -...

Pcs mcg

Verify US Station Mode - Prox Ops Verify RS Station Mode - Prox Ops Verify US GNC Mode - CMG TA Verify RS SUDN Mode - CMG TA 4. LOADING REQUIRED PPLs TO THE PRIMARY GNC MDM MCC-H For all PPLs designated in step 2 to be loaded to the Primary GNC MDM, coordinate with ODIN. 5. LOADING REQUIRED PPLs TO THE BACKUP GNC MDM For all PPLs designated in step 2 to be loaded to the Backup GNC MDM, coordinate with ODIN 6. LOADING REQUIRED PPLs TO THE C& C MDM For all PPLs designated in step 2 to be...

Compound Specific Analyzer Combustion Products I Csacp Resupply

JNT OPS UF1 - ALL FIN 8 Page 1 of 3 pages OBJECTIVE Resupply two new CSA-CP units, ten new Battery Packs, one new Zero Filter, and two spare Pump Filters. The resupplied CSA-CP sensors CO and HCL may give elevated readings as a result of stowage during launch and transfer. The units should be deployed in an open environment for two to four weeks for the elevated readings to decrease to nominal levels. The Exp 7 primary CSA-CP S N 1008 should remain on board. The Exp 5 and backup Exp 7 CSA-CPs...